Information management
Information management is crucial in facilitating the smooth running of construction projects. It is the collecting, storing, distributing, archiving and deleting/destroying of information. Efficient information management ensures that the right people have the right information at the right time enabling them to make the right decisions. It is generally centrally managed and allows the parties to project or programme to manage their time and resources in the most effective way to achieve the desired results.
Typically, information management is achieved with the use of information management systems that provide a common structure, protocols and automated systems.
In the course of a construction project, consultants, clients, contractors and subcontractors generate huge amounts of information, much of it in a digital format. Storing information in this format is easier compared to hard copy documents, papers, drawings, letters, invoices and other by-products of the construction process (for more information see: Document control).
The introduction of Building Information Modelling (BIM) in the construction industry has helped standardise the way that digital data and information are created, stored and managed so that it is easier for teams to collaborate and ensure the client's information requirements are satisfied.
Once stored effectively, information can increase value by allowing management, planning, organising, structuring, processing, controlling, evaluating and reporting to take place in a more efficient way. However, the information that is stored must be retrievable and understandable if it is to have maximum value.
The first step in information management is creating or collecting information such as capturing the client’s requirements, expressing the brief, formulating initial responses and solutions. This may be followed by architectural concept sketches, formal plans, which are then supplemented by designs from other consultants, such as engineers, surveyors, contractors and sub-contractors. Depending on requirements, some stakeholders may also have rights to access or input information.
On projects using BIM, these requirements may be described as Employer's Information Requirements (EIR). A common data environment (CDE) may be created as the single source of information. This is used to collect, manage and disseminate documentation, the graphical model and non-graphical data for the whole project team (i.e. all project information whether created in a BIM environment or in a conventional data format). On small projects, the CDE may simply be a collection of folders on a single server or could be a web-based file-sharing application such as Dropbox.
For more information see: Building information modelling.
Projects may go through a number of stages, or gateways, at which information is collated and approved, then change control processes are introduced for aspects of that information that are considered 'frozen'. For more information see: Change control and Data drop.
A Request for Information (RFI) (occasionally referred to as a Technical Query) is a formal question asked by one party to a contract on a construction project to the other party. Typically this will be a request from the contractor to the client’s consultant team, but it may be between any of the parties, for example from a sub-contractor to a contractor. For more information see: Request for Information
[edit] Related articles on Designing Buildings
Featured articles and news
How orchards can influence planning and development.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.